Campus Center building exterior at Bellingham Technical College - Dawson Construction

Bellingham Technical College Seismic Repairs

Sector
Education
Location
Bellingham, WA
Client
Bellingham Technical College
A two-stage structural repair of Bellingham Technical College's Campus Center, from emergency gravity load work to a building-wide seismic retrofit delivered as GC/CM.

Overview

Architect
Zervas Architects
Completed
January 29, 2026

Campus Center is the heart of Bellingham Technical College. It holds the library, student life, event spaces, and food services for a campus that trains much of Whatcom County's skilled workforce. When truss reinforcement work in the summer of 2023 revealed deeper structural concerns, BTC closed the building and brought in Dawson as the emergency contractor to begin gravity load repairs, the work that keeps a building safely carrying its own weight.

In spring 2024, BTC and the Washington State Department of Enterprise Services concluded a competitive GC/CM procurement, and Dawson was selected to deliver the remainder of the project. The team included Zervas Architects and Coffman Engineers, with the work divided into two stages: gravity load repairs to secure the existing structure, followed by seismic strengthening of the roof, foundation, and structural steel to bring the building into compliance with current code.

Dawson ran the seismic stage through preconstruction services, packaging scopes of work for competitive sub-bids while crews protected finished interiors with chipboard and screening so heavy structural work could happen inside a building the college intended to fully reoccupy. Throughout the closure, classes and services relocated across campus, and the project team coordinated closely with BTC so students stayed on schedule while the building was rebuilt around them. The renovated Campus Center returns to service for Winter Quarter 2026.

BTC brought Dawson in for an emergency repair, then chose us again through a competitive state procurement to finish the job. Two selections by the same client on the same building is the kind of trust we work to earn.

Campus Center exterior with brick and glass curtain wall at Bellingham Technical College
Exposed steel seismic trusses in a Campus Center conference room at Bellingham Technical College
Campus Center corner elevation at Bellingham Technical College
Renovated commons with wood ceiling inside Campus Center at Bellingham Technical College
Structural steel bracing framing campus views inside Campus Center at Bellingham Technical College
Brick lounge alcove with glazing inside Campus Center at Bellingham Technical College
View through Campus Center brick window opening at Bellingham Technical College
Event hall inside Campus Center at Bellingham Technical College
No items found.

Project Wins

01

Under Budget, Ahead of Schedule

Disciplined buyout and schedule performance returned savings to BTC, funding added scope beyond the original contract, including new rain canopies for the building.

02

Two-Stage Structural Program

Gravity load repairs secured the building's ability to carry its own weight, then seismic strengthening of the roof, foundation, and structural steel brought the structure into compliance with current building code.

03

From Emergency Contractor to GC/CM

Dawson began as the emergency contractor for gravity load repairs and was then selected as GC/CM for the full seismic retrofit through a competitive procurement led by BTC and the WA State Department of Enterprise Services.

04

A Campus Hub Preserved

Repair and strengthening kept BTC's library, student life, event, and food service spaces in their existing home rather than replacing the building.